Deliverable 5 due May 13, 2015
Part 2 - Summary of Cost Analysis
In creating a model to compare prototyping and
manufacturing, it becomes clear that there is a clear tradeoff between parts
produced and cost. For prototyping, a team looks to minimize waste, increase
speed, and identify possible improvements and redesigns. In the manufacturing
stage, the team looks to reduce cost as much as possible per yo-yo.
Manufacturing is more of a profit-driven process, whereas prototyping still
remains in the design stage.
With respect to costing the two processes, several factors
are important. In our model, we included the sunk cost of the machines, which
we valued at 50,000, 30,000, 60,000 and 15,000 for the lathe, mill, injection
molding machine and thermoform, respectively. We estimated our mass to be
approximately 50 grams, and our volume to be 30 cc, and a cost of .1 cent
average per gram of raw material. For the turning and milling of our molds, we
predict about 1.5 kWh per mold. For injection molding and thermoforming, we
predict about .2 kWH per part, or 100 kWs. For time/labor, we estimate that
each yo-yo to completion (once the molds have been made), will take
approximately 5 working minutes, where each employee is on average $10 per
hour.
All of these factors have been put into a matlab script, and
plotted as cost per yo-yo versus number of yoyos produced.
Part 3 - Reflection
One of the characteristic components of our yo-yo is the spokes part that holds the steel balls. To get the effect of an overbalanced wheel we wanted the compartments for the balls to be as large as possible. We found out early on that a big constraint on our design was the locations of ejector pin holes in the injection molding machine. In order to remove each spokes part from the machine the pins and the material need to line up. This not only meant making our compartments smaller, but we also had to increase the thickness of the walls so the pins can slide in the grooves of the mold. In the end, these changes didn't affect the functionality or aesthetics of our design and I think our yo-yo would do well in mass production.
Part 4 - Recommendations
Although manufacturing a yo-yo is a great experience that teaches several different manufacturing processes, students never get the chance to see many of the other methods covered in the course in practice- for example welding, metal casting, or deposition methods. This material is covered in problem sets and lectures, but not hands on. Though it is significantly more time intensive for each student to learn to weld (and not practical to add to the course), live examples are much more engaging and informative for students than problem sets. The field trips to manufacturing companies are helpful, but if possible, it would be better to have these demonstrations (welding, laser sintering, etc.) on campus so that more students will have the chance to attend. These demonstrations could be in the place of, or in addition to the problem sets and exams, dependent on whether there is any predicted additional time commitment from students.
In summary, 2.008 is a fun and informative course, and the most valuable skills learned from the class are how to navigate many different manufacturing processes. However, it is one thing to know the manufacturing theory and another to see a process in action. It is more valuable to see how people and machines work to create products than to do problem sets on beam bending that have already been covered in other mechanical engineering courses at MIT.
Thanks for a great semester!